Trench Drain Replacement, LSG Facility, DCA
Ronald Reagan Washington National Airport
Project Narrative
Provided the design, phasing plan, and construction administration of a new trench drain system for a vehicle delivery area totaling 15,000 square feet. In addition to the trench drain system, the design included 8,000 square feet of asphalt-to-concrete replacements. Mr. Omran was responsible for the structural and electrical coordination between engineers, architects, and contractors.
Size: 15,000 Square Feet
Completion Date: 2019
Project Statistics
|
|
|
Square Feet | Dollars | Months D/B | Years |
---|