United Airlines Facilities, LGA
LaGuardia Airport
Project Narrative
In preparation for the reconstruction of the Central Terminal Building at LaGuardia Airport, United Airlines has awarded a contract to the Giuliani Associates Design Team for A/E services to relocate United facilities from Hangar 2 and Building 85 to Building 28 (former U.S. Post Office). The project consists of outfitting Building 28 to accommodate ground service equipment offices, shops & stores; aircraft maintenance offices, shops & stores; and facility maintenance offices. United anticipates occupying the relocated facilities by the end of 2013. Giuliani Associates has a long standing relationship with United Airlines and has been providing the airline with design service for over forty years.
Past projects for United include the expansion of Terminal C at Boston’s Logan International Airport; the expansion of Concourse C and D at Washington Dulles International Airport; studies for Tiers 2 and 3 at Washington Dulles International Airport; Concourse G at Washington Dulles International Airport; Midfield FIS at Washington Dulles International Airport; Red Carpet Clubs, Holdrooms, Ticketing, and Operations spaces throughout the system.
Client: United Airlines
Size: 25,000
Project Statistics
|
|
|
Square Feet | Dollars | Months D/B | Years |
---|
Design & Construction Team
Architect | Giuliani Associates
Civil Engineer | Ewell W. Finley
Geotechnical Engineer | Yu & Associates
Structural Engineer | Ewell W. Finley
M/E/P Engineer | Guth Deconzo
Environmental Engineer | Apex
Cost Estimator and Scheduler | Faithful and Gould