Trench Drain Replacement

LSG Facility, DCA

Project Narrative

Provided the design, phasing plan, and construction administration of a new trench drain system for a vehicle delivery area totaling 15,000 square feet. In addition to the trench drain system, the design included 8,000 square feet of asphalt-to-concrete replacements. Mr. Omran was responsible for the structural and electrical coordination between engineers, architects, and contractors.

Client: LSG Facility

Size: 15,000 Square Feet

Completion Date: 2019

Project Statistics

Square Feet Dollars Months D/B Years